Concrete is a mixture of sand, crushed stone or gravel, and a paste consisting of water and portland cement. It becomes more powerful and harder to damage as it gets old, making it needed to get sidewalks and driveways. It can be tricky to pour successfully, so it’s important to avoid several problems which may cause the appearance of seams and bubbles known as “bugholes.”

Air

Air becomes entrapped in concrete throughout the mixing and pouring procedure. While some air is necessary to avoid harm when the concrete experiences freezing and thawing temperatures, too much causes bubbles or blisters on the surface which then dissolves into holes. This may be caused by improper mixing — the seams of combining remove excess air; too short of a drying period before the surface is smoothed down with a trowel or other instrument; or the surface isn’t smoothed correctly.

Water

Very similar to air, water is a necessary part of cement mixing. But too much moisture weakens the mix and also traps bubbles which work their way to the surface, causing bugholes. Water damage may also occur when the surface is completed off before appropriate “bleeding” period is supplied; this is necessary drying period which allows water and air to surface before the surface is smoothed over.

Release Agent

A barrier that’s used between hardened concrete and another surface — like the supporting timber used to mould a sidewalk or driveway — is called a release or demoulding agent. These chemical oily substances can cause difficulties in brand new cement if they are mixed into the cement, or even used in improper levels for the work. And just like water and air, they could cause holes to appear in which they come into contact with the brand new cement.

Other Factors

Pouring concrete could be tricky even when mixed correctly. Temperature and weather have to be factored in; tangible shouldn’t be poured in extreme cold or hot weather, or when it is raining. In case a thick slab of concrete is pumped, like for a driveway, it is going to require more “bleed time” before it is completed than for thinner slabs. If the subgrade — the surface below the poured concrete — is far cooler than the surface, additional time should also be awarded for bleeding before smoothing occurs.